Energy Development Georgia is a leading Georgian company specializing in the production of clean and renewable energy.

Our mission is to strengthen the country's energy independence through the rational and sustainable utilization of natural resources. Our activities are based on the integration of modern technologies, the highest safety standards, and care for the environment.

Since its establishment, the company has been actively developing alternative sources of hydro, wind, and solar energy. We believe that the future belongs to green energy and we work every day to turn this vision into reality.

Our Vision and Values

Minimal environmental impact, high social responsibility, and innovative engineering solutions form the core of our activities.

Our Projects

Active and planned power plants located in various regions of Georgia

Sashuala HPP
Hydro
Active

Sashuala HPP

Capacity: 2.25 MW Location: Guria, Georgia

The Sashuala HPP has an installed capacity of 2.25 MW. The construction of the plant began in August 2021, and it was commissioned in July 2023. The electricity is sold on the wholesale electricity market. The company uses high-quality European technologies and equipment at the hydropower plant, which are typical for renewable energy businesses. Among them are turbines, hydraulic systems, generators, electrical devices, transformers, and pipeline. Specifically, the plant is equipped with European-made equipment from Vaptech, Schneider, and Noksel.

Sashuala HPP 1
Hydro
Active

Sashuala HPP 1

Capacity: 8 MW Location: Guria, Georgia

Sashuala HPP 1 is a run-of-the-river plant with an installed capacity of 8 MW, located in Chokhatauri municipality near the village of Metsieti. Sashuala HPP 1 was commissioned in 2021. The plant is equipped with European-made equipment from Vaptech, Schneider, and Noksel.

Sashuala  HPP 2
Hydro
Active

Sashuala HPP 2

Capacity: 5 MW Location: Guria, Georgia

Sashuala HPP 2 is another run-of-the-river hydroelectric plant located in the Chokhatauri municipality. It has an installed capacity of 5 MW. Construction of the Sashuala HPP 2 began in April 2018 and it was commissioned on December 24, 2019. The plant is equipped with European-made equipment from Vaptech, Schneider, and Noksel.

Surebi HPP
Hydro
Under Construction

Surebi HPP

Capacity: 15 MW Location: Guria, Georgia

Surebi HPP is a potential hydroelectric power plant project located in the Chokhatauri municipality, on the Supsa River. In March 2024, the company signed an agreement with the Government of Georgia for the preparation of a feasibility study and the subsequent construction and ownership [of the plant]. The plant's planned capacity is 15 MW.

Kutaisi Wind Farm
Wind
Under Construction

Kutaisi Wind Farm

Capacity: 40 MW Location: Kutaisi, Georgia

The first industrial-scale wind power plant in Georgia, utilizing the region's unique aerodynamic potential.

🌍 Eco Impact

Green Energy Calculator

use the slider to calculate the positive environmental impact of the electricity generated by our plants. Learn about carbon savings equivalents.

Capacity: 15.25 MW
🏠

0

Households Powered

🌳

0

Absorbing Trees / Year

Contact Us

We are ready to answer any questions. Write to us or visit our office.

📞

Phone

N/A

✉️

Email

info@edgeorgia.ge

📍

Address

City Tower 70 Vazha-Pshavela Ave, Tbilisi, Georgia

🌱 Your message has been sent successfully!